+44 191 289 6665 enquiries@kinewell.co.uk

Supporting the client in their tender for the project, KLOC was used to optimise the electrical connections for the 700 MW wind farm linking the 80 proposed turbines to the offshore substation. During the project KLOC evaluated in excess of 2.2 billion possible inter-array cable layouts.