Inter-array cable system re-analysis for a major European developer to understand the savings achievable through innovative use of KLOC. The developer described the results as ‘relevant cost
savings’. The study demonstrated that some flexibility in turbine layout, asset crossings, cable type selection, substation positioning, and export cable routing are key to achieving optimized
CAPEX and added revenues through reduced transmission losses.